I think it has become a bit of a struggle to keep up to the time constraints that the live brief has provided me with. We only had the Christmas holidays to put together a body of work to show Sam Leutton on the day we arrived back at University. From this point we only then had a further two weeks to produce and finish 6 large samples.
I am aware that this is what the industry would be like but it has been a shock to the system. In some ways, this is positive as it is showing me how quickly I can work and I am still maintaining a level of quality that can sometimes be lost when working within small time frames.
I am however finding it quite tough and find myself coming into University early and leaving late. But at the same time, I feel that my skills on the domestic machine are improving greatly because of it and that it has almost acted like an intensive training session.
About Me
Blog Archive
Labels
- Artists/Contextual research (47)
- eFolio application (13)
- Final Major Project (3)
- Final Year (3)
- First Year. (99)
- Intentions (37)
- Locating (23)
- Origins (26)
- PE Task 2 (1)
- Sampling (30)
- Second Year. (77)
- Trend research (8)
- Unit X (35)
- Unit X 2 (17)
No comments:
Post a Comment